Public Jobs

Bids due tomorrow at 2:00pm
12/4/20 2:00 pm
East Valley School District HVAC Upgrades
Architects West, Inc
Spokane, WA
The Work includes is not limited to mechanical upgrades and certain site modifications.
Bids due tomorrow at 3:00pm
12/4/20 3:00 pm
First Presbyterian Church - Bid Package #1 - Additions and Modernizations
Jackson Contractor Group
Walla Walla, WA
This project consists of REPLACEMENT OF MAIN LOBBY AREA TO PROVIDE ENHANCED ACCESSABILITY AND MINOR RENOVATIONS TO SOME OF THE EXISTING BUILDING.
Bidding Closed
10/22/20 3:00 pm
Inchelium School District Announcer/Storage Building
Architects West, Inc
Inchelium, WA
1. The Work includes new building construction, which includes but is not limited to the following: a. Cast-in-place concrete, wood framing systems, interior finish carpentry, foundation waterproofing, building insulation, metal roofing and siding systems, fire stopping systems, joint sealants, steel doors and frames, overhead sectional door, door hardware, vinyl windows, gypsum board, painting, building specialties, electrical power, lighting and communication systems, and as indicated on the Drawings and specified herein. b. The site construction includes site clearing, electrical power, site and building excavation and backfilling, concrete paving, other site improvements as indicated on the Drawings and specified herein.
Bidding Closed
10/14/20 3:00 pm
Brewster 7-12 Modernizations
Architects West, Inc
Brewster, WA
The Work includes modernization of the existing elementary school, new building construction, site development and municipal street and utility improvements.
Bidding Closed
8/26/20 3:00 pm
Othello School District Pre-K Portables Site Work
Architects West, Inc
Othello, WA
The Work includes minor site demolition, site grading and utility installation to prepare the site for the installation of 5 portable classrooms.
Bidding Closed
8/26/20 3:00 pm
Keene-Riverview & Prosser Heights Elementary Schools Additions & Modernizations
Architects West, Inc
Prosser, WA
The Work for both these schools includes but is not limited to building demolition, selective demolition, new building construction.
Bidding Closed
8/14/20 10:00 am
Walla Walla HS Renovation Project, BP 3 - Main Renovations (Sub-Bids to Jackson Contractor Group)
Jackson Contractor Group
Walla Walla, WA
This consists of CONSTRUCTION OF CAMPUS WIDE RENOVATIONS.
Bidding Closed
8/18/20 3:00 pm
Pioneer Middle School Additions & Modernizations
Architects West, Inc
Walla Walla, WA
The Work includes selective demolition and new building construction. A. The building construction includes wood framing, cast-in-place concrete, unit masonry, structural steel, steel stud framing systems, exterior and interior finish carpentry, foundation waterproofing, building insulation, sheet metal flashing and trim, new roofing systems, roof accessories, fire stopping systems, joint sealants, steel doors and frames, interior wood doors, overhead coiling doors, sound control door assemblies, aluminum framed entrances and storefronts, door hardware, glass, gypsum board, tiling, suspended ceiling systems, painting, building specialties, residential appliances, window blinds and shades, manufactured casework, fire sprinkler systems, HVAC and plumbing systems, electrical power, lighting and communication systems, as indicated on the Drawings and specified herein. B. The site construction includes site clearing, water, gas, electric and fire water services, grading, drainage control, site and building excavation and backfilling, concrete paving, asphalt paving, landscaping, irrigation, and other site improvements as indicated on the Drawings and specified herein.
Bidding Closed
7/22/20 3:00 pm
Hermiston Public Library Remodel - Phase 1
Architects West, Inc
Hermiston, OR
The Work includes renovation of the 6,664 SF basement level of the existing library, and the addition of an entry vestibule at the north entrance to the main floor. Existing building and new construction is Type III-B. Existing basement has automatic fire suppression (main level does not). 1. The building construction includes cast-in-place concrete, unit masonry repair, structural steel, steel framing and decking, metal fabrications, wood framing systems, cold-formed metal framing, interior finished carpentry, plastic paneling, suspended acoustic tile ceilings, building insulation, membrane roofing, soffit and siding systems, sheet metal flashing. 2. The sitework construction consists of ADA approach to the new entry vestibule and pavement markings.
Bidding Closed
6/10/20 12:00 pm
SCC Building 10 Energy Upgrades
Architects West, Inc
Spokane, WA
The Work includes removing and replacement of greenhouse glazing at three greenhouse areas in one building. Installation of shade curtains and auxiliary power system, as well as various modifications to existing building systems to support completion of this project.