Lincoln High School Additions and Modernizations

A. The building construction includes wood framing, cast-in-place concrete, unit masonry, structural steel, steel stud framing systems, exterior and interior finish carpentry, foundation waterproofing, building insulation, sheet metal flashing and trim, new roofing systems, roof accessories, fire stopping systems, joint sealants, steel doors and frames, interior wood doors, aluminum framed entrances and storefronts, door hardware, glass, gypsum board, tiling, suspended ceiling systems, painting, building specialties, window blinds and shades, manufactured casework, fire sprinkler systems, HVAC and plumbing systems, electrical power, lighting and communication systems, as indicated on the Drawings and specified herein.

Status

Bidding Closed

Prebid Date6/23/21 1:00pm

Bid Date7/22/21 3:00pm

Company & Contacts

Architects West, Inc

Kevin Cole - kevinc@architectswest.com   (208) 667-9402

Location

Walla Walla

Project Estimate: $7,961,000.00

Bidders may download electronic files at no cost. Bidders may obtain printed documents by choosing the “Order” option. Refundable documents are available for qualified Bidders. Qualifications and instructions are listed in the Ad for Bid.

A mandatory Pre-Bid Conference has been scheduled for 1:00 pm on June 30, 2021, at Lincoln High School, 421 S. 4th Avenue, Walla Walla, WA. Meet at the main entry. Bidders that would like to request access in addition to the pre-bid conference may contact Pam Bulloch with Wenaha Group: Ph: (208) 866-6808; e-mail: PamB@wenahagroup.com.