Grandview High School Track Storage and Restroom Building

The Work includes but is not limited to: a. The building consists of wood stud wall construction, pre-fabricated preengineered wood trusses, exterior and interior finishes, asphalt shingle roofing system, building insulation, hollow metal doors and frames, manual overhead sectional doors, restroom accessories, limited HVAC, plumbing fixtures and systems, electrical power, lighting, all constructed on existing concrete foundations and concrete slab-on grade, and as indicated on the Drawings and specified herein. b. The site construction includes installation of water, sewer, electric services, to the building, grading, limited concrete and asphalt paving, limited landscaping and irrigation modifications, and other site improvements as indicated on the Drawings and specified herein.

Status

Bidding Closed

Prebid Date9/25/19 12:30 am

Bid Date10/2/19 3:00 pm

Company & Contacts

Architects West, Inc

Kent Chadwell - kentc@architectswest.com   (208) 667-9402

Location

Grandview, WA

Project Estimate: $270,000.00

Bidders may download electronic files at no cost. Bidders may obtain printed documents by choosing the “Order” option. Refundable documents are available for qualified Bidders. Qualifications and instructions are listed in the ‘Documents’ Section.

09/25 – A non-mandatory Pre-Bid Conference has been scheduled for 12:30 pm on Wednesday, September 25, 2019, at 1601 W. 5th Street, Grandview, WA 98930. Proceed to the Grandview High School Stadium for further directions.