East Valley School District Site Safety and Circulation Improvements

The Work includes is not limited to site clearing, concrete and asphalt placement, irrigation and landscape work. The site construction includes site clearing, water, grading, drainage control, site excavation and backfilling, site lighting, concrete paving, asphalt paving,
  Specifications (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
01 - Cover and Table of Contents 309.1 KB
02 - Documents - Intro Info, Bidding Req and Contract Req 529.5 KB
03 - Division 1 - General Requirements 666.7 KB
04 - Division 3 - Concrete 186.7 KB
05 - Division 10 - Specialties 143.9 KB
06 - Division 12 - Furnishings 104.8 KB
07 - Division 31-33 - Site 707.0 KB
08 - Division 31-33 - Civil 408.6 KB
09 - Circulation Improvements Drainage Report with Geotechnical Report 29.6 MB
10 - Division 26 - Electrical 738.8 KB